|   With the infrastructure facilities available as mentioned below, downtime of the machines can be reduced to the maximum extent possible and thus the power generation can be maximized.
 Being a manufacturer of WEG also helps, since we have accumulated considerable experience in the field and we have on our rolls Engineers trained abroad in the specific line of activity.
 
 
 Well trained Engineers / Technicians Stock of sufficient sparesMobile phone facility at the site  (to have constant touch with field personnel)Full fledged offices with phone and fax facilities at sites Jeeps, Vans, Lorries and Trailers to facilitate transportation of men and materials. 	Computer at site with Internet Connectivity  for   providing   necessary   information   on   power generation etc., |